Internal pipe off a shell nozzle, brackets on pad plates, roof rafters into the centre ring.
The pad plate goes on before the bracket.
Scope
Mechanical installation and welding
Setting
Tank being fitted out
Plates
3 photographs
On this job no bracket went straight onto the shell. Every attachment sat on a pad plate, and the pad was welded to the shell. The close-up above shows one. If the bracket ever has to come off, it comes off the pad and the shell is untouched.
How it was built
One plate to a stage. Press a plate to open it full size.
1200X1600
Stage01 / 02
01
The internal pipe runs from a shell nozzle across the tank.
Pads went down on the bottom plates as well, the stands went on the pads and the pipe sat on the stands. When the stands come off, the pads take the damage instead of the bottom plates.
Internal pipe off the shell nozzle.
1200X900
Stage02 / 02
02
The roof goes on radial rafters into a centre ring.
Roof rafters into the centre ring.
Temporary steel goes on and comes off all the way through a job like this. Every place it was welded is ground back flush before the tank is painted.