The close-up shows a finished root, taken down the bore from the open end of a spool.
Project · Mechanical installation and welding · tank farm
A new valve station at the base of a storage tank. We set and levelled the valves, fitted the spools, welded and bolted the joints, and tied the run into the existing pipe rack.
Scope
Mechanical installation and welding · tank farm
Setting
Live plant, work front under cover
Plates
3 photographs
A storage tank needed a new valve station and a connection into the existing pipe rack.
The valves went on adjustable stands and we levelled them before anything was fixed. We did not tack until the run was straight and the flange faces were parallel.
One plate to a stage. Press a plate to open it full size.
The work front sat under temporary cover, with the plant live around it.